Calculate the Shut Down Point of Precision Engineering Department

$4.50$2.501702 reads

Question

Precision Engineering department has collected data on its average costs of production for the past 12 months. The monthly fixed cost is $4000 per month. The AVC and associated output data are presented below:

Month Q     AVC $
Jan 70 375  
Feb     58     540       
Mar      160     450       
Apr      120     255       
May      130     138       
Jun      120     150       
Jul      10     450       
Aug      35     350       
Sep      80     60       
Oct      110     70       
Nov      100     90       
Dec      190     153    

Explain the significant point in determining the shut down condition of Precision Engineering department.

Summary

The question belongs to Statistics and it is about calculating the shut down condition in the company from the data given in the AVC table of Precision Engineering deparment.

 

Add to Cart